+7(495) 780-53-88

ABOUT COMPANY

For the six years on the market of system integration, Flylink company made more then 200 projects of different types: SCS installation in office, CCTV mounting, Access control systems installation, warehouse management systems, and so on.

Company news, page 3

Completed outdoor lightning in trade center “Barvikha Luxury Village” («Áàðâèõà Ëàêøóðè Âèëëàäæ»)

22.11.2011   Completed outdoor lightning in trade center “Barvikha Luxury Village” («Áàðâèõà Ëàêøóðè Âèëëàäæ»)

FlyLink was choosen by administration of trade center “Barvikha Luxury Village” to perform works regarding developing outdoor lightning systems. Our experts performed all necessary measurements, to confirm accordance to the state standards, and successfully completed this mission.

Lightning panels mounting for LLC “Ultimatum Grup” («ÎÎÎ «Óëüòèìàòóì Ãðóï Ìîñêâà»)

21.11.2011   Lightning panels mounting for LLC “Ultimatum Grup” («ÎÎÎ «Óëüòèìàòóì Ãðóï Ìîñêâà»)

Our experts completed installation of 8 lightning panels for outdoor lightning. To increase efficiency and control functions each panel was equipped with automation system. Everything was done in time. Customer needs were completely satisfied.

Installations on the warehouses of “Urenholt-Logistics” («Óðåíõîëüò-ëîãèñòèêñ»)

28.10.2011   Installations on the warehouses of “Urenholt-Logistics” («Óðåíõîëüò-ëîãèñòèêñ»)

On spring FlyLink company completed mounting industrial Wi-Fi systems, Fiber optic lines, and access control cyctems for warehouses of “Urenholt-Logistics” company, that are located in Chekhov (Moscow region)

Design and technical maintenance of wireless networks on warehouse of company “Marr Russia” («Ìàðð Ðóññèÿ»)

18.10.2011   Design and technical maintenance of wireless networks on warehouse of company “Marr Russia” («Ìàðð Ðóññèÿ»)

In October 2011 FlyLink company started work, according to agreement for technical maintenance of cable network and equipment in warehouses of “Marr Russia”, total area is more then 40,000 sqm. Moreover, our experts installed additional SCS and wireless systems.

SCS renovation in office of “Promsvyazbank” (ÎÀÎ «Ïðîìñâÿçüáàíê») (branch “Stromynka” («Ñòðîìûíêà»)

28.09.2011   SCS renovation in office of “Promsvyazbank” (ÎÀÎ «Ïðîìñâÿçüáàíê») (branch “Stromynka” («Ñòðîìûíêà»)

Completed renovation of structured cable system in Stromynka office of Promsvyazbank. Customer received completely renovated SCS that matches all customer’s needs and modern standards.

Validation of Structured Cable System in office of Lufthansa company

12.09.2011   Validation of Structured Cable System in office of Lufthansa company

Our experts performed validation of SCS for 5e category in Moscow office of Lufthansa. SCS have about 250 access ports. We used professional analyzer Fluke DTX 1800 – high precision device of last generation. Customer received full set of documentary confirming that its SCS matches all World standards.

Mounting of wireless network in cottage township “Kapitan-Klub” («Êàïèòàí-Êëóá») Tula region

10.09.2011   Mounting of wireless network in cottage township “Kapitan-Klub” («Êàïèòàí-Êëóá») Tula region

Completed works on development the wireless network of industrial size in cottage township Kapitan.
According to agreement and design all works were finished in time, and of highest quality, like we usually do. As a result customer received full-scale wireless network for more then 150 houses.

Mounting and validation of SCS and Data processing center for “Marins Grupp” («Ìàðèíñ Ãðóïï»)

23.08.2011   Mounting and validation of SCS and Data processing center for “Marins Grupp” («Ìàðèíñ Ãðóïï»)

FlyLink experts completed works of implementation of SCS and Data processing center on the film studio, that belongs to “Marins Grupp”.
According to agreement we mounted structured cable system and validated it for 5e and 6 categories, and introduced data processing center for 5 racks. All works were completed according to schedule and high estimated by customer.

SCS and powering network renovation for company Shopping Guide “Ya Pokupau” («ß Ïîêóïàþ»)

22.08.2011   SCS and powering network renovation for company Shopping Guide “Ya Pokupau” («ß Ïîêóïàþ»)

We finished renovation of SCS and powering network in Moscow branch of company Shopping Guide (Yekaterinburg). Also our experts installed additional rack, connected to main line. Our customer was completely satisfied.

FlyLink works on SCS and powering network for company “Utkonos” («Óòêîíîñ»)

20.05.2011   FlyLink works on SCS and powering network for company “Utkonos” («Óòêîíîñ»)

Now FlyLink company is working on project and has already started laying cables for SCS, and powering networks in warehouses of company “Utkonos”. All of warehouse equipment and cash machines will be operated via this SCS.

FlyLink have won tender for 1 year of technical support of Access control system and security alarm of “MInB” («Ìîñêîâñêèé Èíäóñòðèàëüíûé Áàíê»)

19.05.2011   FlyLink have won tender for 1 year of technical support of Access control system and security alarm of “MInB” («Ìîñêîâñêèé Èíäóñòðèàëüíûé Áàíê»)

Our experts have started to perform technical support of access control systems and security alarm systems in office of Moscow Industrial Bank (ÎÀÎ «ÌÈíÁ»). Access control system and security alarm is based on equipment of KODOS (ÊÎÄÎÑ) – wide known mark on the market of security systems, that started in 1996 by Russian manufacturing complex SoyuzSpetsAvtomatika (ÑîþçÑïåöÀâòîìàòèêà). On last autumn we gained status of authorizes installers of KODOS equipment.

SCS Installation in Moscow Dashkova’s Institute

27.01.2011   SCS Installation in Moscow Dashkova’s Institute

Our experts were invited by administration of Moscow Humanitarian Dashkova’s Institute to install structured cable system between lecture rooms.
According to agreement we have made cable channels, mounted cable lines, patch panels, and other equipment. Upon completion customer was provided with working network, and all cover documentation.

27.01.2011   Installation of fiber optic lines and telephony for “TAVR” («ÇÀÎ «ÒÀÂл)

FlyLink’s experts completed their work on project of laying of 2 fiber optic lines and one telephony line on the territory of ZAO “TAVR” Moscow region village Anikovo.

Fiber Optic Lines, and Wi-Fi systems in the warehouses of trading company “Alvisa” («Àëâèñà»)

24.01.2011   Fiber Optic Lines, and Wi-Fi systems in the warehouses of trading company “Alvisa” («Àëâèñà»)

We have completed introduction of fiber optic system for 12 access ports in the warehouses of trading company Alvisa.
It is necessary to have wireless system, that is needed to drive warehouse management system (WMS). Total area is about 14000 sqm. We have made it in 4 days!

Installation of SCS and Fiber optic lines in psychoneurological hospital ¹8 of Solovjov («Êëèíèêà íåâðîçîâ»)

06.12.2010   Installation of SCS and Fiber optic lines in psychoneurological hospital ¹8 of Solovjov («Êëèíèêà íåâðîçîâ»)

Administration of special psychoneurological hospital ¹8 by Solovjov have choosen our company to perform the following: Renovation of existing SCS and installation of new SCS, introduction of servers room, racks, connection of 8 buildings into one network by fiber optic lines, installation of passive and active equipment.

Relocation of two patch racks in main office of OAO Severstal-infokom («Ñåâåðñòàëü-èíôîêîì»)

03.12.2010   Relocation of two patch racks in main office of OAO Severstal-infokom («Ñåâåðñòàëü-èíôîêîì»)

Completed relocation of two patch racks in office of Severstal-ingokom. Also our experts have performed the following: installation of server room, relocation of passive SCS equipment (approximately 400 ports), relocation of passive fber optic system components, relocation of UPS’s and redundant power supplies, installation and setting of active equipment, validation of SCS for 5e, 6 and 7 categories.

FlyLink company gained new status.

19.11.2010   FlyLink company gained new status.

November 201 was very important for us, we gained the status of official installer of KODOS production, that has been confirmed by Certificate.
KODOS – is an upmarket manufacturer of security systems from year of 1996 by company SoyuzSpetsAvtomatika («ÑîþçÑïåöÀâòîìàòèêà»). Thanks to wide product range, innovation technologies, user friendly and easy to use KODOS is recognized leader on the market of security systems.

Security infrastructures for company “Krasivaya Zemlya” («Êðàñèâàÿ çåìëÿ»)

04.10.2010   Security infrastructures for company “Krasivaya Zemlya” («Êðàñèâàÿ çåìëÿ»)

Company “Krasivaya zemlya” is leader on the market for land in Moscow suburbs and in Kaluga region.
We installed and set access control system and CCTV in their office.

Warehouse of Alliance Healthcare Russia – complex design

26.08.2010   Warehouse of Alliance Healthcare Russia – complex design

We designed and made data processing center in the warehouses of Alliance healthcare Russia, located in Klimovsk.
Also there was installed warehouse equipment that can be operated and controlled via radio signals and by bar coding system, this allows to increase total efficiency significantly.

Powering network for company Savage

27.07.2010   Powering network for company Savage

Our experts designed and made powering network on the warehouse of company Savage, located in Krekshino.

Complex installation on warehouse of company “Luch” («ÎÎÎ «Ëó÷»)

15.07.2010   Complex installation on warehouse of company “Luch” («ÎÎÎ «Ëó÷»)

On the territory of Moscow Brewery Company for our customer, company Luch we have mounted Wi-Fi system, based on Motorola equipment. Our job was high estimated by customer.

21.06.2010   Warehouse environment for company “Inform BC” («Èíôîðì ÂÑ»)

WMS for warehouse of Inform BC was based on Motorola and Allied Telesis equipment.

Completed installation of Bluetooth equipment on the warehouse of “Zentr Vnedreniya “Protek” (ÇÀÎ «Öåíòð âíåäðåíèÿ «Ïðîòåê»)

15.06.2010   Completed installation of Bluetooth equipment on the warehouse of “Zentr Vnedreniya “Protek” (ÇÀÎ «Öåíòð âíåäðåíèÿ «Ïðîòåê»)

We provided loading machines of warehouses of Zentr vnedreniya Protek with wireless equipment.

“Zentr Vnedreniya “Protek”, introduction of Bluetooth equipment onto the warehouse loading machines

24.05.2010   “Zentr Vnedreniya “Protek”, introduction of Bluetooth equipment onto the warehouse loading machines

According to agreement we have started to install wireless Bluetooth based equipment onto the loading machines (still running)

Bluetooth based equipment for the wrehouse loading machines for company “Protek”

12.05.2010   Bluetooth based equipment for the wrehouse loading machines for company “Protek”

We have signed the agreement regarding installation of Bluetooth based equipment onto the warehouse loading machines of Company “Protek”

25.03.2010   Cable structures for company “Granoil” (ÎÎÎ «Ãðàíîéë»)

In tough schedule we have mounted SCS and fiber optics in office of company “Granoil”.

Bakery “Bulange” (ÎÎÎ «Áóëàíæå»)

23.03.2010   Bakery “Bulange” (ÎÎÎ «Áóëàíæå»)

Access control system and working hours registration system for bakery “Bulange”.

Networks for warehouses complex of company for company “PNK-2” (ÎÎÎ «ÏÍÊ-2»)

18.03.2010   Networks for warehouses complex of company for company “PNK-2” (ÎÎÎ «ÏÍÊ-2»)

We have completed project of SCS, fiber optic lines, Wi-Fi, and powering networks in offices of warehouse complex “Chekhov” of company PNK-2

15.02.2010   Wireless systems for company “Torgovy Dom Servistorg” (ÎÎÎ «Òîðãîâûé Äîì Ñåðâèñòîðã»)

We have made wireless radio network, based on Cisco equipment for company “Torgovy Dom Servistorg”

Complex works on Hotel-ship “Brandvakhta 745” for “Marins Grupp” Union.

24.12.2009   Complex works on Hotel-ship “Brandvakhta 745” for “Marins Grupp” Union.

We are happy to inform you that we have signed an agreement regarding creation on the hotel-ship “Brandvakhta 745” that belongs to “Marins Grupp” Union, Wi-Fi network, satellite TV, and system of home theatres.

PHOTOALBUM OF OUR PROJECTS

Cabling Systems.


Fiber Optic Lines.


Wireless Networks.


Powering and Lightning.


Security Systems.



Our clients