ATS Installation
You have already passed the stage of designing an automatic transfer switch and its subsequent stage of manufacturing (assembly ATS). Congratulations! This is really very important two stages. But it is still needed to install and connect the ATS to the circuits the input power supply.
The introduction of the ATS
For the implementation of this stage will require the following works:
- installation of the cabinet ATS;
- laying power cables from the power source;
- laying of cable lines from ATS to its energy consumers
- Connection of all systems to the ATS;
- electric measurements connected systems and cable lines;
- commissioning, which is produced as a result of test check of the ATS;
- commissioning.
Performance of high standards in all work produced, and most electrical installation ensures electrical safety of your facility, reliability and convenience of your service personnel.
All work on the electrical system and electrical performed by our qualified engineers with experience of 3 years. Each employee is certified in accordance with the State Electrical Code.
|